This 2006 Normet Spraymec 7110 WPC Concretedistributionbooms is offered through Machinery Depot Pro at $38,150, export-ready and available for inspection before purchase — year of manufacture 2006, 1,500 recorded hours, currently located in FR.
Machine overview
Normet Spraymec 7110 WPC units in this class are bought for one reason: predictable running cost. We list concretedistributionbooms that still have working life left in them rather than machines that need a rebuild before they earn anything. Hours, service history and known faults are disclosed up front — you should never learn about a problem after the container has sailed.
Specifications
| Brand & Model | Normet Spraymec 7110 WPC |
|---|---|
| Year | 2006 |
| Hours | 1 500 h |
| Location | Villeneuve Tolosane, Occitanie |
| Reference | 4BD42F06 |
| Stock No. | RBP02 |
| Manufacturer No. | 132 |
| Grossweight | 17 000 kg |
| Engine | 85kW |
| Transportdimensions | 8100 x 2260 x 3080 mm |
Inspection and verification
- Independent pre-purchase inspection can be arranged at the machine’s location.
- Hour meter, serial number and service records verified before deposit.
- Photo and video walkaround supplied on request.
Shipping and export
We handle loading, lashing and documentation for container or roll-on/roll-off shipping, and quote delivered prices to West Africa, East Africa, Southern Africa, the Middle East, South Asia and Latin America. Duties and port charges are quoted separately so the landed cost is clear before you commit.
Price and availability
Listed at $38,150. Machines in this bracket move quickly — send an enquiry to confirm the unit is still available and to request the full photo set.
Buying concretedistributionbooms — what matters
Buyers usually come to 2006 Normet Spraymec 7110 WPC Concretedistributionbooms with one of three questions: will it do the job, what does it really cost, and how fast can it be on site.
- Specification over price. Two products in concretedistributionbooms can share a description and be built to very different standards. Check the spec table above before comparing prices.
- Quantity. Order to the drawing plus a realistic allowance. A second delivery usually costs more than the material it carries.
- Lead time. Stock position moves weekly. We confirm availability before you commit, not after.
- Volume pricing. The listed $38150 is the single-unit rate; ask for a contract rate on quantity.
Frequently asked
Is 2006 Normet Spraymec 7110 WPC Concretedistributionbooms in stock?
Stock moves daily. Send the quantity you need and we confirm availability, current price and lead time the same day.
Can I get a better price on volume?
Yes. Trade and project pricing is available on request — the listed price is the counter rate.
How is it delivered?
Inspected, verified hours, worldwide export. Delivery is quoted against the site address so you see the true landed cost.















